Sunday, April 8, 2012

Saturday 4/7

The brick is 80% done and the siding had to stop at 99% only because they cant finish the front edges until the brick is done, which now looks like Monday.

The PM came through for us and installed brick on the left side of the garage which normally has a panel of siding :)
REALLY?!
The first mud step was completed today, it was definitely pretty sloppy inside on the floors. Globs of mud everywhere and some of the work didnt look as clean as it should, we shall see after the first sanding what they come up with.


9 comments:

  1. Your brick and siding look great! They really worked hard to get everything laid so quickly-dry wall too. I'm astonished at how different it looks when it's all done. Feels and looks so much more like a house!

    ReplyDelete
  2. Looking good! It's amazing how quickly they work. Sorry to see they were a bit sloppy!

    ReplyDelete
  3. This is a little off topic, but how did you get the Virtual Tour of the model on your blog?

    ReplyDelete
  4. Did they put the electrical panel in your garage instead of the basement?

    ReplyDelete
    Replies
    1. Yes we have two tall 200 amp boxes on the side wall

      Delete
  5. That looks like an interior door between you house and garage. Isn't that supposed to be a fireproof door or whatever they call them? At least an exterior door?

    ReplyDelete
    Replies
    1. Yes. It is a metal exterior door with a tight seal.

      Delete